Our installation process is designed to minimize the impact of noise and dust to the greatest extent possible. Additionally, KN boards reduce the physical effort required for installation.

Our Installation Method

1 Base Leveling


Ensure the wall or floor is smooth and stable, providing a solid bonding foundation for the KN board.

Clean the base: Remove dust and impurities from the wall or floor.

Level the base: Use cement mortar to adjust the surface, ensuring a deviation of no more than 3-5mm.

Curing: Keep the base moist and allow 2-3 days for natural curing.

2 Apply Adhesive


Enhance bonding strength and waterproofing to ensure the KN board is securely installed.

Mix the adhesive: Mix the adhesive components according to the correct ratio.

Apply adhesive: Evenly spread the adhesive with a thickness of 2-3mm.

Groove treatment: Create grooves on the adhesive surface to improve adhesion.

3 Install KN Board


Ensure the board is installed smoothly and securely on the wall or floor.

Handle boards carefully: Handle large boards carefully to avoid breakage.

Install boards: Attach the boards to the adhesive layer, ensuring no gaps.

Clean excess adhesive: Remove any excess adhesive immediately after installation.

4 Surface Treatment


Enhance the board’s aesthetics and waterproofing.

Surface finish: Polish or finish the surface of the board.

Waterproof treatment: Chamfer the board’s corners at a 45-degree angle to improve both aesthetics and waterproofing.

Natural curing: Allow the installed boards to dry naturally for 3-7 days, ensuring the adhesive fully cures.